Metric guide · Carryover

How carryover is counted

Carryover is the work a team did not finish in a sprint and carried on with. Agile Analytics counts it with one rule in every view, so the same sprint shows the same number wherever you look. This is the sentence you see above every carryover number:

Carryover: items that were in the sprint for at least a day and were not done when it ended, including ones moved straight to the next sprint. Items moved back to the backlog count as removed scope.

The rule

An item is carryover for a finished sprint when all three are true.

  1. 1. It was really in the sprint

    The item sat in the sprint at the end of at least one sprint day. An item pulled in by mistake and taken out again the same day never counts.

  2. 2. It was not done

    It had not reached a state your Workflow Mapping calls Done by the time the sprint ended (or by the time it left the sprint). Work finished up to one day after the last sprint day still counts as done, so a late close in another time zone is not held against the team.

  3. 3. It stayed or rolled forward

    It was still in the sprint when the sprint ended, or it was moved straight into the next sprint. Moving it anywhere else, such as back to the backlog, makes it removed scope instead.

Examples

What happenedCarryover?Why
Still In Progress when the sprint ends.YesIt was in the sprint and not done.
Moved to the next sprint halfway through, unfinished, to make room.YesMoving work forward early is still carrying it over.
Pulled in by mistake and moved out an hour later.NoIt was never in the sprint at the end of a day.
Moved back to the backlog, unfinished.NoThat is removed scope: the team decided not to do it, rather than carrying it.
Added one day before the end and not finished.YesIt counts, and the view says how many items were added in the last 2 days so a late pull cannot hide inside the number.
Reached Ready to Release on the last day, mapped as Done.NoDone means the first state your Workflow Mapping calls Done, whatever happens after it.

How the number is worked out

The percentage

Carryover items divided by every item that was in the sprint at the end of at least one day. It can never go over 100%, and it does not need a commitment: a sprint planned on the fly still gets a carryover number.

Finished sprints only

A running sprint shows a dash with "Carryover is counted when the sprint ends." Averages and trends only use sprints that have ended.

Filling in after the page loads

Carryover reads each finished sprint’s history from Azure DevOps. The rest of the page appears first and the carryover cells fill in a moment later (you may briefly see “…”). Each sprint is read once per session.

Items with no sprint history

Imported or very old items sometimes have no recorded sprint moves. They are treated as in the sprint on every day, and Sprint Summary says how many there were.

Where you see it

Sprint Summary

The Carryover tile on each team card, and the Carryover column in the one-line-per-team strip.

Sub-teams

The Carryover column for each sub-team.

Dashboard

The Carryover column and average in Sprint Velocity, and the Carryover figure in the current sprint panel.

Delivery Signals

The Carryover Rate card and the Carryover column in the sprint table.

Exec Report

Carryover in each team’s section, the combined headline and the copied or printed report.

Where it is not used yet

These are the places where a carryover figure can still differ, so you can recognise the difference instead of chasing it.

Team Benchmarks, Retro Snapshot and the Team Health widget

These still show the earlier measure (committed items not finished by the sprint end) while we move them over. Retro Snapshot compares with your saved retros, so it moves once older snapshots can be compared fairly.

User Metrics

Its per-person carryover is a different measure about each person’s own items, and is not affected.

FAQ

Why did our carryover change in 6.68.0?

Before 6.68.0 different views measured carryover in different ways. Now every view above uses this one rule, so the same sprint shows the same number everywhere. The base is every item in the sprint rather than only the committed ones, and unfinished work moved straight to the next sprint now counts.

Can I change the rule?

No. One rule for every team is what makes the numbers comparable. What you can change is your Workflow Mapping, which decides which states count as Done.

Does Agile Analytics change anything in Azure DevOps to work this out?

No. It reads each item’s sprint and state history in your browser and works the number out there. Nothing is written to Azure DevOps.